What We Do

Services

The full list of deck and patio work available across the Gulf Coast.

Home › Services

Everything we take on

Every job below is one we do ourselves across Gulfport.

Deck Installation

We build new decks from treated pine or composite, sized and framed for the furniture and grill you actually plan to put on it. Footings go below grade and get sized for the span, not just set on a paver and called good. Every job gets a written quote before we cut a single board.

Deck Repair

A deck that bounces when you walk on it usually means a joist has rotted or a beam has sagged, not that the whole thing needs replacing. We pull the decking, check the frame, and replace only what's actually failed. Most repairs take a day or two, not a week.

Deck Staining & Sealing

Pressure-treated pine left bare will gray, crack and start absorbing water within a couple of years in this climate. We pressure wash, let the wood dry fully, then seal with a product rated for direct Gulf Coast sun. Plan on resealing every one to two years depending on how much shade your deck gets.

Custom Deck Design

Multi-level decks, built-in benches, a run of steps down to the yard. We draw it out, price it honestly, and tell you if something you've seen on Pinterest actually requires an engineer's stamp before we build it.

Composite Decking Installation

Composite costs more upfront than pressure-treated pine but doesn't need sanding, staining or sealing. We install hidden fastener systems so you don't see a screw head on the whole deck surface, and we leave the gaps the manufacturer specs for expansion in our heat.

Deck Railing Repair

A wobbly rail is almost always a loose post connection, not a sign the whole railing needs to come off. Posts get re-anchored into the framing, not just the decking, and baluster spacing gets brought up to code if it isn't already there.

Deck Resurfacing

If the frame is solid but the boards are cupped, splintering or just worn out, we strip the surface and install new decking over the existing structure. It's a faster, cheaper fix than a full rebuild when the bones underneath are still good.

Screened Porch Construction

A screened porch off the back of the house keeps the bugs out without closing off the view. We frame it to tie into your existing roofline and run the screening in panels you can replace individually instead of all at once.

Patio Installation

Not everyone wants stairs and a railing. A ground-level patio gives you outdoor space without the framing a raised deck requires, and it's often the better call on a sloped or low lot.

Deck Demolition & Removal

Old deck coming down to make way for something bigger, or coming down because it's not safe to stand on anymore. We haul off the old lumber and hardware so you're not stuck with a trailer full of nails.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Gulfport, MS

Deck and patio work is available throughout this part of the coast.

Gulfport, MS
Biloxi, MS
Pascagoula, MS
Gautier, MS
Ocean Springs, MS
Long Beach, MS
D'Iberville, MS
Picayune, MS
Bay St. Louis, MS
Diamondhead, MS
Waveland, MS
Common Questions

Things worth asking

What tends to come up once a deck or patio project is underway.

Do I need a permit for a new deck?
Most raised decks in Mississippi Gulf Coast municipalities require a building permit, particularly when the deck attaches to the house or exceeds a certain height. Permit applications and fees are handled as part of the project rather than left for the homeowner to sort out.
How long does a typical deck build take?
A standard single-level deck usually takes about one to two weeks from the first day of framing to the final board, weather permitting. Multi-level decks, screened porches or jobs with extensive railing and stairs take longer.
Can a deck be built to fit a specific budget?
Yes, decking material, railing style and overall size can all be adjusted to fit a target number. That honest answer sometimes means pressure-treated pine instead of composite, or a smaller footprint, to hit the budget.
What kind of guarantee comes with deck work?
Workmanship is backed by a warranty covering the construction itself, separate from manufacturer warranties on lumber, composite decking or hardware. Specific warranty terms are included in the written estimate.
Who do I actually deal with during the project?
Homeowners deal directly with the crew doing the work rather than being passed between a sales office and subcontractors. Questions during the build go straight to the person on site.
What decking materials are available?
Pressure-treated pine, cedar, and composite decking from major manufacturers are all installed regularly. Each has a different upfront cost and maintenance schedule, which gets discussed before materials are ordered.
Do I need to be home during the build?
No, as long as there's access to the work area, homeowners don't need to be present for most of the build. Being reachable by phone for questions speeds things along.
How should I prepare my yard before deck work starts?
Clearing furniture, grills, planters and anything breakable away from the existing deck or build site ahead of time lets the crew get started without delay. Pets should be kept clear of the work area for their own safety.
What happens if rot or damage turns up once the old deck comes off?
Hidden rot, termite damage or a failing ledger connection gets flagged immediately with photos and a revised quote before any further work proceeds. Covering it up instead of fixing it just creates a bigger problem in a few years.
How should a new deck be maintained?
Pressure-treated pine should be cleaned and resealed roughly every one to two years in Gulf Coast humidity, while composite decking mainly requires periodic washing to prevent mildew buildup. Keeping gutters and nearby drainage clear also reduces how much water sits under the deck frame after a storm.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (228) 567-4457